MORTAR / DRY-MIXED

MORTAR / DRY-MIXED
Grouting

GROUTING

Professionally restore structure integrity and performance in 4 easy steps.

1. Surface Preparation
Clean and roughen the substrate. Remove dust, oils, and contaminants. Pre-wet to saturated surface-dry before grouting.

2. Formwork Installation
Install sturdy, leak-proof formwork and seal joints to prevent grout loss.

3. Mixing
Mix grout with clean water using a mechanical mixer for a smooth, lump-free mix.

4. Placement & Curing
Place grout continuously within working time and cure immediately to prevent shrinkage.